Undergrounding of the quadruple railway line - Treis Gefyres
SALFO undertook the remaining studies for the “Undergrounding of the quadruple railway line for the segment “Athens Central Station – Tris Gefyres”.
The scope included:
- Railway and Roads Alignment
- Structural Design of the Cut & Cover (1,500m)
- Railway Superstructure – Rheda 2000
- Noise and vibration
- MEP
- Soft & Hard Landscape
In implementation of Directive 2008/57/EC and 2009/131/EC on the interoperability of the rail system within the Community and of Directive 2011/18/EU, the project received the Certificate of EC Verification 1960/6/SG/15/INS/ GR EN/ ITCF 171 for the Infrastructure Subsystem, including requirements of SRT TSI.
Photo source: Ergose S.A.